面对业主方不断下行的预算压力,团队通过方案及初步设计,以工程量清单作为依据,进行多轮设计优化与成本测算,最终将单平米造价降低400元,从2600元/m2压缩至2200元/m2,确保了该印尼生产基地项目在成本可控的前提下顺利推进。
Faced with the continuously tightening budget constraints, our team utilized the BOQ from the schematic and preliminary design phases as a basis for multiple rounds of design optimization and cost analysis. This process ultimately reduced the cost per square meter by 400 RMB, bringing it down from 2,600 RMB/m² to 2,200 RMB/m².
印度尼西亚 肯达尔工业园区 / Kendal Industrial Park, Indonesia
中国 广东碧容化妆品有限公司 / Guangdong Birong Cosmetics, China
25,300 m2