马来西亚 |TG. ARU到UMS的步行桥
MALAYSIA | JARINGAN PEJALAN KAKI DAN BERBASIKAL DARI TG. ARU KE UMS
GCD为SEA - OVM提供了专业的工程咨询服务。所涉及的结构是一座地锚式悬索桥,这彰显了GCD在悬索桥工程和结构优化方面的专业能力,我们的主要交付成果包括:
- 优化吊杆力,以实现理想的结构状态并提高主缆的安全系数
- 精确计算主缆的几何形状和相应的无应力长度
- 确定吊杆的无应力长度,使其符合设计规格
GCD provided specialized engineering consultation services to SEA-OVM. This technical support underscores expertise in suspension bridge engineering and structural optimization:
- Hanger force optimization to achieve an ideal structural state and enhance the main cable’s safety factor.
- Precision calculations for the main cable’s geometric configuration and corresponding pre-tensioned length.
- Hanger pre-tensioned length determination to align with design specifications.
建设地点 / Project site:
马来西亚 亚庇 / Kota Kinabalu, Malaysia
项目业主 / Project Owner:
SEA-OVM / SEA-OVM (Cable Manufacturer & Supplier)