MALAYSIA | JARINGAN PEJALAN KAKI DAN BERBASIKAL DARI TG. ARU KE UMS

GCD为SEA - OVM提供了专业的工程咨询服务。所涉及的结构是一座地锚式悬索桥,这彰显了GCD在悬索桥工程和结构优化方面的专业能力,我们的主要交付成果包括:

  1. 优化吊杆力,以实现理想的结构状态并提高主缆的安全系数
  2. 精确计算主缆的几何形状和相应的无应力长度
  3. 确定吊杆的无应力长度,使其符合设计规格

GCD provided specialized engineering consultation services to SEA-OVM. This technical support underscores expertise in suspension bridge engineering and structural optimization:

  1. Hanger force optimization to achieve an ideal structural state and enhance the main cable’s safety factor.
  2. Precision calculations for the main cable’s geometric configuration and corresponding pre-tensioned length.
  3. Hanger pre-tensioned length determination to align with design specifications.

建设地点 / Project site:

马来西亚 亚庇 / Kota Kinabalu, Malaysia

项目业主 / Project Owner:

SEA-OVM / SEA-OVM (Cable Manufacturer & Supplier)