Menu

马来西亚 | 新班达尔 · 拉瓦斯大桥
MALAYSIA | NEW BANDAR LAWAS BRIDGE

GCD 作为领先的索体制造商和供应商 SEA - OVM 的咨询合作伙伴,提供专业的技术咨询服务。值得注意的是,虽然悬挂系统并不承担桥梁上部结构的结构荷载,但我们的团队仍提供了关键的工程见解,包括:

  1. 主缆理想化几何形状和无应力长度的精确计算
  2. 吊杆无应力长度

此次合作彰显了 GCD 在平衡装饰设计意图与工程严谨性方面的专业能力。

GCD served as the consulting partner for SEA-OVM—a leading cable manufacturer and supplier—by providing specialized technical advisory services. Notably, while the suspension system does not bear structural loads for the bridge’s superstructure, our team delivered critical engineering insights, including:

  1. Precision calculations for the main cable’s idealized geometry and pre-tensioned length,
  2. Hanger pre-tensioned length. This collaboration underscores GCD‘s expertise in balancing decorative design intent with engineering rigor.

建设地点 / Project site:

马来西亚 砂拉越州 拉瓦斯 / Lawas, Sarawak, Malaysia

项目业主 / Project Owner:

SEA-OVM / SEA-OVM (Cable Manufacturer & Supplier)

设计时间 / Designed In:

2015年 / 2015

We Chat